A correctly selected meter can still perform poorly when installed outside its approved conditions. Installation planning should address the hydraulic assembly, accessibility and communications together, with a clear record of what was checked at commissioning.

Prepare the hydraulic assembly

Verify diameter, connection type, pressure and water-temperature ratings. Clean and flush the line according to the installation procedure before introducing the meter. Avoid transferring pipe stress to the body. Arrange isolation and access so future work is possible. Requirements for strainers, check valves and straight lengths are specific to the model and project; there is no universal layout for every ultrasonic meter.

For a WE RICH product comparison, the LXC DN15–DN50 ultrasonic water meter with valve control combines ultrasonic measurement with remote valve control for residential supply points.

For a WE RICH product comparison, the LXC-D DN50–DN300 ultrasonic bulk water meter addresses larger-diameter water measurement at network and bulk supply points.

Keep the measuring section in its approved condition

Confirm the permitted direction and mounting position. The measuring tube generally needs to remain full for the intended closed-pipe application. Identify locations where air can collect or where supply interruptions can leave the line partially filled. Follow the manufacturer procedure for filling and venting. Do not assume an empty-pipe alarm compensates for unsuitable hydraulic conditions.

Commission the complete installation

Record serial number, starting register, flow direction and any initial alarms. Check for leaks and confirm register response using the approved procedure. If remote reading is included, verify radio performance with the pit cover and enclosure in their final positions. Link the meter identifier to the correct customer or asset record. Keep photographs and test results for future fault investigation.

Practical checklist

  • Use the model installation manual.
  • Document pipe filling and orientation.
  • Confirm asset-to-account mapping.

Frequently asked questions

Are straight lengths always required?

Requirements depend on the approved meter design and installation configuration.

Can the meter be installed vertically?

Only if the exact model permits that orientation under the applicable conditions.

Should the radio be tested before closing the pit?

Test during setup and again with the final cover closed; the final condition is decisive.

Related articles

References and technical reading

Product capabilities depend on the model and its documentation. Confirm installation and performance requirements for the project.

Explore the products for this application

Confirm the selected model’s approved flow range, installation conditions and available communications before specifying it. These options support product evaluation; they do not replace site testing.