Submetering divides a facility’s water use into meaningful areas or processes. Its value comes from identifying where water is used and assigning responsibility for investigation, maintenance and operational improvement.

Choose useful boundaries

Start with the main supply meter and draw the branches serving cooling, irrigation, kitchens, tenants or production areas. Select boundaries that correspond to real decisions. Too few meters can hide an important use; too many can create data that nobody reviews. Include bypasses and alternate supplies in the drawing.

For a WE RICH product comparison, the LXC DN15–DN20 composite ultrasonic water meter combines a composite body with ultrasonic measurement for residential metering.

For a WE RICH product comparison, the LXC DN15–DN50 ultrasonic water meter with valve control combines ultrasonic measurement with remote valve control for residential supply points.

For a WE RICH product comparison, the Head End System (HES) brings collected readings and communication status into an operational view, with interfaces agreed for the project.

Make comparisons consistent

Compare volumes over the same interval and in the same units. Main and submeter totals may differ because of timing, storage changes, unmetered branches or measurement error. A difference is a reason to investigate, not automatic proof of leakage. Record installation dates and register resets so the history remains interpretable.

Assign a response workflow

Define expected operating patterns and who receives an exception. Investigate unusual use with facility schedules and maintenance records. Start with a small hierarchy that answers priority questions, then expand after the team demonstrates regular use. If data supports tenant billing, separately confirm the metrological and contractual requirements.

Practical checklist

  • Draw the measurement hierarchy.
  • Align units and intervals.
  • Assign an owner to each exception.

Frequently asked questions

Must totals match exactly?

No. Check timing, storage and measurement uncertainty before interpreting a difference.

Where should I start?

With a supply map and the largest or least understood uses.

Does submetering save water automatically?

It provides information; savings depend on operational action.

Related articles

References and technical reading

Product capabilities depend on the model and its documentation. Confirm installation and performance requirements for the project.

Explore the products for this application

Confirm the selected model’s approved flow range, installation conditions and available communications before specifying it. These options support product evaluation; they do not replace site testing.