WASIONWater solution powered by WE RICHNewsroom
Back to Solutions →

A hybrid template combining fixed-network collection with planned mobile reading routes.

Connect by zone. Manage together.

This reference design uses AMI in zones with validated fixed-network coverage and AMR routes where mobile collection is required. Both paths feed an agreed reading platform, with meter identifiers and timestamps reconciled before utility integration. Device support for each path is confirmed during design.

Meter models, reporting intervals, network coverage and interfaces are defined during project design.

Technician installing communications equipment on a tower

How the reading reaches the utility

01

Water meters

Select compatible devices for the collection path assigned to each zone.

02

AMI path

Collect through fixed gateways and a network server.

03

AMR path

Collect on planned routes with compatible mobile readers.

04

Unified review

Reconcile identifiers, timestamps and duplicate records from both paths.

05

Utility systems

Use agreed exports or interfaces for billing and analysis.

General LoRaWAN utility reference

From field validation to local support

01

Field survey

  • AMI coverage and AMR route assessment
  • RF signal tests at installation points
  • Technical report to the client
02

Zone planning

  • GPS location definition
  • AMI / AMR zone assignment
  • Phased migration plan
03

Hybrid pilot

  • Gateway and mobile reading trials
  • Data reconciliation tests
  • Solution optimization
04

Training and support

  • Operational and installation training
  • Project follow-up
  • Quality control
  • After-sales support

A repeatable collection cycle

01 / Segment the network

Assign zones to AMI or AMR based on field coverage, access and operational priorities.

02 / Collect through both paths

Run scheduled AMI transmissions and planned AMR routes according to the zone design.

03 / Reconcile records

Review source, timestamp and meter identifier; resolve duplicates and missing readings.

04 / Expand in phases

Evaluate pilot results and migrate suitable zones to AMI when coverage and device compatibility are validated.

Functions to configure for the project

Zone-based collection

Maintain a clear collection method and responsibility for each service area.

Record reconciliation

Agree record priorities and duplicate handling before combining the two paths.

Phased migration

Plan changes in gateways, devices and operations before expanding AMI coverage.

Survey. Pilot. Roll out. Support.

Site survey

Review meter locations, installation conditions, gateway sites, power and backhaul.

Pilot validation

Test field coverage, reading delivery and integration on representative service points.

Phased deployment

Install and commission by zone; confirm device registration and reading acceptance.

Operational handover

Train the team, document the configuration and agree support and exception workflows.

Details to complete for a project proposal

ItemTo be defined
Meter populationQuantity, diameters, models and installation locations
Radio planAMI coverage plan, AMR routes and device compatibility by zone
Reading scheduleAMI intervals, AMR route frequency and record priority rules
Hosting & integrationReading platform, duplicate handling and utility integration
Acceptance criteriaReading delivery target, pilot duration and handover requirements

Related AMI+AMR components

Plan your AMI+AMR deployment

Discuss meter selection, coverage and integration with our local team.

Contact our team →