A fixed-network template for automatic water meter reading, from field devices to the Head End System.

From each meter to one operational view

This reference design connects compatible water meters to fixed LoRaWAN gateways. A network server manages LoRaWAN communications, while the HES collects meter readings and makes them available for utility operations and agreed integrations.

Meter models, reporting intervals, network coverage and interfaces are defined during project design.

Ultrasonic water meter installed in an outdoor utility cabinet

How the reading reaches the utility

01

Water meters

Measure consumption; transmit using a compatible radio interface.

02

Fixed gateways

Receive meter transmissions and forward them over the available backhaul.

03

Network server

Manage LoRaWAN devices and route data to the application.

04

Head End System

Collect readings, track communications and support operational review.

05

Utility systems

Use agreed exports or interfaces for billing and analysis.

General LoRaWAN utility reference

From field validation to local support

01

Field survey

  • RSSI and SNR measurement
  • Underground signal tests
  • Technical report to the client
02

Network planning

  • GPS location definition
  • Redundancy calculation
  • Simulation with in-house software
  • Results export
03

Pilot installation

  • Test gateway installation
  • RF design adjustment
  • Requirements collection
  • Solution optimization
04

Training and support

  • Operational and installation training
  • Project follow-up
  • Quality control
  • After-sales support

A repeatable collection cycle

01 / Register

Associate each meter identifier with its service point and configure its communication profile.

02 / Read & transmit

The meter records consumption and sends readings at the configured interval.

03 / Collect & review

The HES organizes incoming records; operators review missing readings and supported device events.

04 / Share & act

Approved records are exported or integrated with the utility workflow; exceptions are assigned for follow-up.

Functions to configure for the project

Scheduled collection

Set reporting schedules and monitor reading availability.

Device supervision

Review communication status and supported battery or meter events.

Data integration

Define export formats, system interfaces and access roles with the utility.

Survey. Pilot. Roll out. Support.

Site survey

Review meter locations, installation conditions, gateway sites, power and backhaul.

Pilot validation

Test field coverage, reading delivery and integration on representative service points.

Phased deployment

Install and commission by zone; confirm device registration and reading acceptance.

Operational handover

Train the team, document the configuration and agree support and exception workflows.

Details to complete for a project proposal

ItemTo be defined
Meter populationQuantity, diameters, models and installation locations
Radio planRegional frequency plan, coverage survey and gateway locations
Reading scheduleReporting interval, required data fields and event support
Hosting & integrationNetwork server / HES hosting, access roles and agreed interfaces
Acceptance criteriaReading delivery target, pilot duration and handover requirements